Council Strategic Plan 2024-2029
Full title: Municipality of Strathroy-Caradoc Corporate Strategic Plan 2024 - 2029 Update
Council's to-do list for the town from 2024 to 2029, saying what it wants to get done and roughly when.
- It is a short 12-page plan that updates the town's first 10-year strategic plan from July 2020.
- It sets a new vision, mission and six values (service, teamwork, respect, integrity, progress, compassion).
- It has six goal areas: infrastructure, economic development, community well-being, community safety, customer service, and managing growth.
- Each goal area lists projects in two time blocks: 2024-2026 (this term of Council) and 2027-2029 (next term).
- It does not give costs, budgets or measurable targets; it points to the Transportation Master Plan and other infrastructure master plans for the details.
Why it matters to you
This is the plan the Mayor referred to as 'a strategic plan that your tax dollars paid for'. Its 2024-2026 list is what this Council said it would work on before the 2026 election, so residents can check each item against what actually happened.
Council first received the Strathroy-Caradoc Strategic Plan 2024-2029 Update for information, then passed a second motion to adopt it and to direct the CAO to report back on an implementation plan, how the plan would be measured, and an annual update; both motions are shown as 'Carried' with no recorded vote in the minutes. The copy attached to that agenda (doc 22659) has the same text as the website version.
Promises about this plan
- Colin Grantham (Mayor): He promised a council-approved four-year capital budget tied to the Asset Management Plan, and to follow the strategic plan and the roads, water/wastewater and recreation master plans already paid for, instead of making a new strategic plan.
What the plan says to do (30)
Progress only changes when a public record shows something was done. Page numbers point to the plan itself.
- Adopt a long-term plan and timetable for infrastructure works, and update it every year. page 7Not yet checked
When: 2024-2026 (adopt and update annually); 2027-2029 (update annually) - Put in place the interim (temporary) wastewater solution for Mount Brydges. page 7Not yet checked
When: 2024-2026 | Cost: 2024: MTB WWTP Upgrades - $6 Million (2022 CF) (2025 budget version of the plan, S18) | Where: Mount Brydges - Identify and design the permanent wastewater solution for Mount Brydges, then build it. page 7Not yet checked
When: Identify and design 2024-2026; construct 2027-2029 | Cost: 2026: Allocation to MTB Sewers - $3 million; 2027: Allocation to MTB Sewers - $3 million (2025 budget version of the plan, S18) | Where: Mount Brydges - Finish consultation, design, engineering and construction of the Strathroy Downtown Redevelopment. page 7Not yet checked
When: 2024-2026 | Cost: Downtown Revitalization - $12 Million (one cell covering both downtown rows, drawn across the 2025 to 2027 columns) (2025 budget version of the plan, S18) | Where: Downtown Strathroy - Finish consultation, design, engineering and construction of the Mount Brydges Downtown Redevelopment. page 7Not yet checked
When: 2024-2026 | Cost: Downtown Revitalization - $12 Million (one cell covering both downtown rows, drawn across the 2025 to 2027 columns) (2025 budget version of the plan, S18) | Where: Downtown Mount Brydges - Update the Roads Needs Study, make a priority list for tar-and-chip surfacing of north/south rural roads, start the work, and keep tar-and-chipping more rural roads each year. page 7Not yet checked
When: Study and start 2024-2026; continue each year 2027-2029 | Cost: 2024: To be Received in 2024, Queen St Phase #2 - $8 million, Saxton Road Re-design and construction $3.2 million, Strathroy Crossing Drain - $2.5 million, Parkhouse Dr - Rougham to Adelaide - $7.5 million; 2025: Head St , High St, Oxford/Richmond upgrades - $15 million; 2026: McKellar St Upgrade -$3.5 Million, Adelaide Rd Upgrade Phase #1 - $2.5 million; 2027: Adelaide Rd Phase #2 - $3.5 million, York St Upgrade - $3.5 million, Falconbridge Rd. - $3 million, Pannell Lane - $1.8 million, Glengyle Rd - $2.4 million (2025 budget version of the plan, S18) | Where: North/south rural roads; budget version names Queen St Phase #2, Saxton Road, Strathroy Crossing Drain, Parkhouse Dr (Rougham to Adelaide), Head St, High St, Oxford/Richmond, McKellar St, Adelaide Rd Phases #1 and #2, York St, Falconbridge Rd., Pannell Lane, Glengyle Rd - Make a priority program to repair, replace and extend sidewalks, start the work, and keep doing it each year. page 7Not yet checked
When: Program and start 2024-2026; continue each year 2027-2029 - Finish design, engineering and approvals for more capacity in both water systems, then build the added capacity. page 7Not yet checked
When: Design and approvals 2024-2026; construct 2027-2029 | Where: Both water systems - Finish design, engineering and approvals for more capacity in the Strathroy wastewater system, then build it. page 7Not yet checked
When: Design and approvals 2024-2026; construct 2027-2029 | Cost: 2024: STR WWTP Upgrade - $10.1 Million (2022 CF) (2025 budget version of the plan, S18) | Where: Strathroy wastewater system - Change road and streetscape design standards to plan for more walking, cycling, one-person electric vehicles and transit, then start using them for new roads and bike lanes. page 7Not yet checked
When: Modify standards 2024-2026; begin to implement 2027-2029 - Finish the Official Plan Review, get County approval, and set the urban settlement boundaries. page 8Not yet checked
When: 2024-2026 | Cost: Part of BBP Ops budget (2024-2025) (2025 budget version of the plan, S18) | Where: Strathroy and Mount Brydges settlement areas - Rewrite the Zoning By-law to match the new Official Plan, and resolve any appeals. page 8Not yet checked
When: Revise 2024-2026; resolve appeals 2027-2029 | Cost: 2024: Part of BBP Ops budget (2025 budget version of the plan, S18) - Set rules for when the town would pay up front to put services into new employment (industrial) lands and recover the cost over several years. page 8Not yet checked
When: 2024-2026 and 2027-2029 - Resolve the problem of getting services to employment lands along Centre Road and Highway 402. page 8Not yet checked
When: 2024-2026 | Where: Centre Road and Highway 402 - Strengthen the Business Retention and Expansion program, focusing on sectors such as agriculture and agribusiness, and prepare plans to attract and keep commercial business in Strathroy and Mt. Brydges. page 8Not yet checked
When: Begin plans 2024-2026; complete and begin to implement 2027-2029 | Cost: Part of Ec Dev Ops budget (each year 2024 to 2029) (2025 budget version of the plan, S18) | Where: Strathroy and Mt. Brydges - Ask the County to adopt a policy for bike lanes on County Roads. page 9Not yet checked
When: 2024-2026 | Where: County Roads - Evaluate Expressions of Interest for a public/private partnership to build a recreation complex in Mount Brydges. page 9Not yet checked
When: 2024-2026 | Where: Mount Brydges - Start talks with all relevant parties on a plan to attract and keep family doctors and support walk-in clinics. page 9Not yet checked
When: 2024-2026 - Look at possible incentives to get housing built across the whole range of housing needs. page 9Not yet checked
When: 2024-2026 and 2027-2029 | Cost: 2024 and 2025: Part of BBP Ops budget (2025 budget version of the plan, S18) - Not yet checked
- Finish and open the new Fire Station 1. page 10Not yet checked
When: 2024-2026 | Cost: Stn #1 Firehall - $10 million (drawn across 2024-2025) (2025 budget version of the plan, S18) - Find a site for a new Fire Station 2 (possibly shared with other town uses), then design and build it. page 10Not yet checked
When: Site 2024-2026; design and construct 2027-2029 | Cost: MTB-Melbourne Hall - $4 million (drawn across 2025-2026 in the Fire Station 2 row) (2025 budget version of the plan, S18) | Where: Budget version names MTB-Melbourne Hall - Ask the Province for mental health beds and services in the community. page 10Not yet checked
When: 2024-2026 and 2027-2029 | Cost: 2025: Part of the Ops budget (2025 budget version of the plan, S18) - Finish the Police Service's next-generation 9-1-1 service and start building the new Police Station. page 10Not yet checked
When: 2024-2026 | Cost: 9-1-1: 2025 Part of Finance Ops budget; new Police Station: Police HQ Annex - $9 million (drawn across 2025-2026) (2025 budget version of the plan, S18) | Where: Budget version names Police HQ Annex - Create, use and report on customer service response standards. page 11Not yet checked
When: 2024-2026 | Cost: 2025: Part of Ops budget (2025 budget version of the plan, S18) - Finish the Service Delivery Review, start carrying out its recommendations, and keep reviewing and implementing them. page 11Not yet checked
When: Complete and begin 2024-2026; continue 2027-2029 | Cost: 2024: To be Received in 2024 (2025 budget version of the plan, S18) - Review and upgrade the town website. page 11Not yet checked
When: 2024-2026 | Cost: 2024 and 2025: Part of LLS Ops budget (2025 budget version of the plan, S18) - Update the Development Charges study to help pay for growth-related infrastructure. page 12Not yet checked
When: 2024-2026 - Make a forward-looking plan for the best and most sustainable way to deliver town services. page 12Not yet checked
When: 2024-2026 - Keep asking provincial and federal governments for infrastructure funding, and keep using planning policies that encourage denser development in urban areas. page 12Not yet checked
When: 2024-2026 and 2027-2029 | Cost: 2025: Part of Ops Budget (2025 budget version of the plan, S18) | Where: Urban settlement areas
How to tell if it is being followed
- Look for the CAO report Council asked for on June 17, 2024 (implementation plan, how the plan will be measured, and an annual update); none was found in minutes up to mid-2026, and the direction was removed from the outstanding-motions list on July 7, 2025.
- Compare each year's capital budget with the 2025 budget version of the plan (FIN-2024-25 attachment), which puts dollar amounts beside plan items, for example Stn #1 Firehall $10 million, MTB WWTP Upgrades $6 Million, STR WWTP Upgrade $10.1 Million, Downtown Revitalization $12 Million, Police HQ Annex $9 million, and the named road projects for 2024 to 2027.
- Check each year's budget and the multi-year capital budget for line items matching the 2024-2026 and 2027-2029 projects (for example Mount Brydges wastewater, water capacity, Fire Station 1 and 2, sidewalks, tar-and-chip roads).
- Read the 'Strategic Plan Alignment' section at the end of staff reports to see which goal staff say a decision supports, and whether it uses the 2024 goal list or the older 2020 list.
- Watch tenders and contract awards on the town's bids page and in council minutes for the named projects, such as the downtown redevelopments and the Roads Needs Study.
- Check Strategic Priorities meeting agendas and minutes, where many plan items (customer service standards, Service Delivery Review, policies) were brought to Council.
- After the 2026 election, see whether the new Council reviews, renews or replaces this plan, since its 2027-2029 column covers the new term.
What has happened since
- June 15, 2026
Council voted to go ahead with an Infrastructure Ontario loan for the Fire Station #1 Replacement (related to plan item A21). [S17] - September 15, 2025
Council endorsed a Customer Service Strategy and Implementation Plan in principle, pending 2026 budget deliberations, and adopted Customer Service Standards (related to plan item A25). [S16] - July 7, 2025
Council removed two motions from its list of outstanding motions: the motion adopting the Strategic Plan 2024-2029, and the direction for the CAO to report on an implementation plan, measurement and annual update. The minutes do not say whether that report was ever delivered. [S15] - June 16, 2025
Council adopted 'Strathroy-Caradoc Vision 2055' in principle: ten statements on what the town could look like in 30 years, to guide the Official Plan review, the Mount Brydges wastewater environmental assessment, and future plans. The staff report (S13) says it carries no financial commitment. [S14] - January 13, 2025
Council received the Service Delivery Review final recommendations report for information and directed the CAO to draft an implementation plan for February 18, 2025 (plan item A26). The February 18 implementation plan item was removed from that agenda. [S12] - October 15, 2024
Finance Committee received report FIN-2024-25 (2025 Budget - Foundations and Priorities) for information. Its attachment 'Strategic Plan 2024 -2029-Update with Budget' is the plan's action table with a column for each year 2024 to 2029, showing a dollar amount or a budget source beside many items. Examples: Stn #1 Firehall - $10 million; MTB WWTP Upgrades - $6 Million (2022 CF); STR WWTP Upgrade - $10.1 Million (2022 CF); Allocation to MTB Sewers - $3 million in 2026 and in 2027; Downtown Revitalization - $12 Million; Police HQ Annex - $9 million; MTB-Melbourne Hall - $4 million; and road projects by year (2024 Queen St Phase #2 $8 million, Saxton Road $3.2 million, Strathroy Crossing Drain $2.5 million, Parkhouse Dr $7.5 million; 2025 Head St, High St, Oxford/Richmond $15 million; 2026 McKellar St $3.5 Million, Adelaide Rd Phase #1 $2.5 million; 2027 Adelaide Rd Phase #2, York St, Falconbridge Rd., Pannell Lane, Glengyle Rd). Many softer items are marked 'Part of ... Ops budget'. Water capacity, sidewalks, the Development Charges study, the County bike-lane policy, the Mt Brydges rec complex, family doctors and the dog park have no amount shown. Council received the report and did not approve the amounts. [S18] - September 9, 2024
At a multi-year budget discussion, members noted that the top operational and capital priorities are provided for in the Strategic Plan and could be discussed at a future Finance meeting. [S10]
Words used in this plan
- Strategic plan
- A council's list of goals and projects for the next several years.
- Vision statement
- One or two sentences describing what the town wants to become.
- Mission statement
- One sentence describing what the town government does to get there.
- Tar-and-chip
- A cheaper road surface made of liquid asphalt covered with stone chips, used on rural roads.
- Service Delivery Review
- An outside study of how the town delivers its services and where it could do better or save money.
- Development Charges
- Fees paid by builders of new homes and businesses to help pay for the roads, pipes and facilities growth needs.
- Settlement boundary
- The line on the Official Plan map showing where towns like Strathroy and Mount Brydges are allowed to grow.
- Received for information
- Council acknowledged a report without approving or adopting it.
Sources
- [S1] Municipality of Strathroy-Caradoc, Municipality of Strathroy-Caradoc Corporate Strategic Plan 2024 - 2029 Update. plan document; 12-page PDF, read in full. Saved as strategic-plan.pdf. Undated; the Mayor's message calls it the 2024 update.
- [S2] Municipality of Strathroy-Caradoc, Studies, Plans & Publications. web page; Links both the 2024-2029 update and the July 2020 plan. The intro text on the page still lists the six 2020 goals, including 'Destination Building'.
- [S3] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - June 17, 2024 (item 7.1 Strathroy-Caradoc Strategic Plan), June 17, 2024. minutes; Read from local text copy. David Cash and Bill Winegard of Cash and Associates presented. Received (Pelkman/Brennan, Carried); adopted with CAO direction (Kennes/McGuire, Carried). No recorded vote shown. The agenda attachment was municipal_strategic_plan_updated.pdf (doc 22659).
- [S4] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - June 10, 2024 (CAO-2024-22 Review of Vision and Mission Statements), June 10, 2024. minutes; Council chose Vision Option 4, Mission Option 3 (with 'ensure' replaced by 'create') and Service Value Option 3, and sent the statements to the final draft.
- [S5] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - May 6, 2024 (CAO-2024-10 Options for Revised Vision, Mission and Value Statements), May 6, 2024. minutes; Report received for information and referred to a workshop.
- [S6] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - September 18, 2023 (FIN-2023-37 Strategic Planning Consultant), September 18, 2023. minutes; Contract for facilitation, development and delivery of the Strategic Plan awarded to Cash and Associates Inc. for $65,575 plus HST (Brennan/Kennes, Carried). The task list dated this Sept 19, 2023; the minutes say the meeting was September 18, 2023. Staff report: S22.
- [S7] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - January 17, 2024 (Strategic Plans Workshop), January 17, 2024. minutes; The 2020-2029 Corporate Strategic Plan was attached as background (minutes item 4.4; the inventory lists it as 5.4). Consultants Murray Clarke and Bill Winegard led the discussion; next steps included a public survey and community engagement.
- [S8] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - April 11, 2024 (Strategic Plan Workshop #3), April 11, 2024. minutes; Council sorted the draft goals into short, medium and long-term timing, with the time frames adjusted to match the current and next terms of Council, and beyond.
- [S9] Municipality of Strathroy-Caradoc, Municipality of Strathroy-Caradoc Corporate Strategic Plan 2020-2029 (July 2020). plan document; Earlier 17-page plan that the 2024 update replaces. Skimmed only. Saved for reference as strategic-plan-2020.pdf. Its six goals included 'Destination Building', which the 2024 update dropped and replaced with 'Community Safety'.
- [S10] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - September 9, 2024 (FIN-2024-17 2025-2027 Multi Year Budget Discussion), September 9, 2024. minutes; Read from local text copy.
- [S11] Municipality of Strathroy-Caradoc (eScribe), Finance Committee Meeting Minutes - October 15, 2024 (FIN-2024-25 2025 Budget - Foundations and Priorities), October 15, 2024. minutes; Received for information. Attachment 'Strategic Plan 2024 -2029-Update with Budget' (doc 24529) is summarized under S18.
- [S12] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - January 13, 2025 (Service Delivery Review - Final Recommendations Report), January 13, 2025. minutes; The February 18, 2025 minutes record that item 9.5.2 'Service Delivery Review Implementation Plan - CAO-2025-06' was removed from the agenda.
- [S13] Municipality of Strathroy-Caradoc, Council Report CAO-2025-12 Strathroy-Caradoc Vision 2055, June 16, 2025. staff report; Linked from https://www.strathroy-caradoc.ca/city-hall/vision-2055/. The council decision is in the June 16, 2025 minutes (S14).
- [S14] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - June 16, 2025 (item 10.6.1 Vision 2055), June 16, 2025. minutes; Vision 2055 adopted in principle (Kennes/McGuire, Carried). Final document: https://media-001-ca.cdn.govstack.com/strathroy-caradoc-005-ca/media/mhkja4aa/sc-vision-2055-final-may-28-2025-1.pdf
- [S15] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - July 7, 2025 (LLS-2025-10 Listing of Outstanding Motions - July 2025 Update), July 7, 2025. minutes; Both strategic plan motions appear in two separate removal motions in these minutes.
- [S16] Municipality of Strathroy-Caradoc (eScribe), Regular Council Meeting Minutes - September 15, 2025 (Customer Service Strategy and Standards), September 15, 2025. minutes; Moved by Pammer, seconded by Kennes, Carried.
- [S17] Municipality of Strathroy-Caradoc (eScribe), Special Meeting of Council Minutes - June 15, 2026 (debt and loan decisions), June 15, 2026. minutes; Motion moved by Kennes, seconded by Hipple, Carried.
- [S18] Municipality of Strathroy-Caradoc (eScribe), Strategic Plan 2024 -2029-Update with Budget (attachment to FIN-2024-25, 2025 Budget - Foundations and Priorities), October 15, 2024. staff report; Two large table pages, undated, no author. read from rendered page images because the table columns do not survive text extraction. Amounts copied as printed; 'CF' is not defined in the document (probably carry-forward).
- [S19] Municipality of Strathroy-Caradoc (eScribe), municipal_strategic_plan_updated.pdf (June 17, 2024 agenda item 7.1), June 17, 2024. plan document; 12 pages; its extracted text matches the website version (S1) word for word, so the website PDF is the adopted version.
- [S20] Municipality of Strathroy-Caradoc, Council Report CAO-2024-10 Council's Strategic Plan - Options for Revised Vision, Mission and Value Statements, May 6, 2024. staff report; Names the consultants as Municipal Strategic Planning Associates (MSPA). Said the final draft would be reviewed at the May 21, 2024 Council meeting; it actually came to Council June 17, 2024.
- [S21] Municipal Strategic Planning Associates, Strathroy-Caradoc - Options for Revised Vision, Mission and Value Statements (April 24, 2024), April 24, 2024. staff report; Lists the 2020 statements and 2-7 options for each; the final plan uses Vision option 4, Mission option 3 (with 'ensure' changed to 'create'), Service 3, Teamwork 2, Respect 1, Integrity 1, Progress 2 and Compassion 3.
- [S22] Municipality of Strathroy-Caradoc, Council Report FIN-2023-37 Strategic Planning Consultant, September 18, 2023. staff report; One RFP covered the Municipality's second strategic plan and the Police Service's first; posted February 13, 2023; seven bids from $49,920 to $74,763; Cash and Associates Inc. scored highest. The Municipality had budgeted 50,000 and the Police Board 20,000. Expected to return to Council late Q1 or early Q2 2024.
- [S23] Municipal Strategic Planning Associates (eScribe), Strathroy-Caradoc Municipal Strategic Plan Update 2024-2029 - April 2 Draft, April 2, 2024. plan document; 11-page draft reviewed at the April 11, 2024 workshop. It still used the 2020 vision, mission and values, and split timing into short (2024-25), medium (2026-27) and long (2028-29) term.
What we could not find
- The 2025 budget version of the plan (S18) is undated and unsigned, and does not say whether the amounts are estimates, approved budgets or totals across years. 'MTB-Melbourne Hall' is not explained, so it is unclear whether it is the Fire Station 2 project.
- No implementation plan, performance measures or annual progress update on the 2024-2029 plan was found in local minutes or on the town website, up to the latest local minutes (September 2026).
- The 2020-2029 plan was not checked for its own adoption vote.